Flat Rate Plumbing Prices: What to Charge for 12 Common Jobs and How to Set Your Own
Chloe Sackett
:
Nov 26, 2026, 7:45:00 AM
Search for flat rate plumbing prices and you will find several 2026 price lists, all confident, all specific. Put three of them side by side on the same job and they disagree by hundreds of dollars. That is the first thing worth knowing about a published price list.
The short answer
A flat rate price is your billable hour times the real task time, plus parts at your markup, plus your service fee and any permit. A plumbing price sheet is that calculation repeated across your common jobs. The job list below is worth copying. The dollar figures on somebody else's list are not, because they carry that shop's overhead rather than yours.
Want the full walkthrough? Read our plumbing pricing guide: how to price plumbing jobs right. This post is the sheet itself, job by job.
Three price lists, one job, three different answers
We pulled three contractor-facing 2026 flat rate plumbing price lists and lined up the jobs they all cover. Here is what they say.
Toilet replacement: $200 to $500 | $250 to $500 | $350 to $650
Sewer camera inspection: $150 to $350 | $150 to $400 | $275 to $550
Tank water heater replacement: $1,200 to $2,500 | $1,200 to $2,800 | $1,700 to $2,900
Sump pump replacement: $400 to $1,000 | $600 to $1,400 | $650 to $1,300
On a toilet, the cheapest list's ceiling sits below the most expensive list's floor. Same job, same year, same country, and no overlap at all.
None of the three says where its numbers came from. One cites three homeowner cost-comparison sites. One calls its figures "industry reference figures." One offers only a note that prices vary by region.
And here is the part worth sitting with. One of those lists tells the reader, correctly, that copying someone else's price list imports that shop's overhead instead of their own. Then it publishes a national price table. Another says on the web page that its prices include parts, while the downloadable version of the same prices says labor only. Same numbers, opposite meaning.
A published price is a record of what somebody charged. It is not a calculation, and it cannot know your wages, your drive times or your truck.
What a flat rate price is actually made of
Four inputs, in this order.
Your billable hour times the real task time, plus parts at your markup, plus your service fee and any permit.
The billable hour is the one that has to be right before anything else matters, because every line on the sheet is built on it. If you have not worked yours out from loaded labor, overhead and the hours you can actually invoice, start there. Our billable hour calculator runs it against your own numbers.
Task time means the whole job: the drive, the diagnosis, the protection down on the floor, the work, the test, the cleanup, the haul-away and the paperwork. Not the wrench time.
On parts, use a markup that holds up at the margin you actually need. A markup percentage and a margin percentage are not the same number, and that gap is where a lot of plumbing shops quietly lose money.
The 12 jobs your plumbing price sheet needs
These are the jobs that appear on essentially every published list, which makes them the ones homeowners actually call about. What follows is the structure for each: what the labor has to cover, what gets marked up, and what people leave out. The numbers are yours to fill in.
| Job | Time the whole job, not the wrench time | Commonly left out |
|---|---|---|
| Toilet replacement | Pull, haul, set, shim, seal, test | Supply line and shut-off while you are there; disposal of the old unit |
| Kitchen faucet replacement | Clear the cabinet, work on your back, seal, test | Seized shut-offs turning a one-hour job into two |
| Bathroom faucet replacement | Same work, tighter cabinet | Pricing it the same as the kitchen when the access is worse |
| Garbage disposal install | Disconnect, mount, re-plumb the trap arm, electrical check, test | The trap rework that almost always comes with it |
| Sink or tub drain clearing | Protect the finish, cable, test, clean up | Cable wear and the cleanup nobody times |
| Main line clearing (cleanout access) | Set up, cable the line, run water, verify flow | A separate, higher line for roof or pulled-toilet access |
| Sewer camera inspection | Run the camera, locate, record, write the report | The report itself, and the camera's replacement cost |
| Tank water heater replacement | Drain, disconnect, carry out, set, connect, fill, test, haul away | The permit. Full worked example here |
| Tankless water heater install | Venting, gas sizing, condensate, mounting, commissioning | Gas line upsizing, which is a different job priced as one |
| Sump pump replacement | Pull, clear the pit, set, check valve, discharge, test the float | Testing under real water rather than by hand |
| Shut-off or supply line repair | Isolate, cut, fit, pressure up, verify dry | Pricing per valve when the real cost is the trip |
| Shower valve cartridge | Identify, shut down, extract, replace, test temperature | A seized cartridge, and the access panel conversation |
Twelve lines, your billable hour, your task times, your parts markup. That is a plumbing price sheet, and it will not match anybody else's, which is the point.
Every line turns into five options
A price sheet with one number per job is still a yes or no question at the door.
Each of those twelve lines should open into five options for the homeowner: the repair itself, then four versions that fix more of why it failed. On a toilet, that ladder runs from the swap, to the swap with new supply and shut-off, to a better-fitting unit, to protection and a longer warranty, up to an agreement that covers the next one.
One rule holds across all twelve. Anything code requires goes in every option, including the cheapest. Code is never an upgrade.
At The New Flat Rate we make flat rate menu pricing software, training and coaching for home service contractors in HVAC, plumbing, electrical, chimney and indoor air quality, and this is the shape every menu takes. On TNFR menus, roughly 80% of customers choose an option above the cheapest one, typically within fifteen to twenty seconds. One price cannot do that, because one price offers one decision.
Before you print the sheet
Three checks worth running on the finished thing.
Does every line trace back to your billable hour? If a price got rounded to look tidy, find out what it rounded away.
Did you time the jobs or estimate them? Estimated task times are where a sheet goes wrong quietly. Time the next five of each and adjust.
Does the cheapest option still leave you whole? If Option 1 is a job you would rather not win, it is priced wrong, not positioned wrong.
Flat rate plumbing price FAQs
How many jobs should a plumbing price sheet cover?
Start with the twelve above, which cover most residential service calls, then add whatever your dispatch board shows you running most often. A short sheet everyone actually uses beats a long one nobody finishes. You can keep adding lines once the first twelve are priced from real numbers.
Should flat rate plumbing prices include parts?
Yes, and say so plainly on the sheet. A number that silently excludes parts is the single most common reason two price lists look comparable when they are not. Decide once, write it on the sheet, and make sure every line follows the same rule.
How often should I update my price sheet?
Revisit it when your costs move, not on a calendar. A wage increase, a new truck, an insurance renewal or a supplier price change all shift your billable hour, and every line on the sheet is built on that number. Many shops review it at least once a year.
Can I just adjust a national price list for my area?
A regional percentage adjusts somebody else's overhead, not yours. Two shops on the same street can need different prices because their utilization, trucks and payroll differ. Use published lists to sanity-check the market, then build your own sheet from your own numbers.
Free template
Build the sheet instead of borrowing one
The 5-Option Price Menu Template takes your billable hour, service fee, tax and markup once, then builds all five options for every job you add. Excel and Google Sheets.